Problem with configuring the project

I have two projects with the same settings:
1) Project 1 - foo/first;

2)  Project 2 - foo/two.

In these projects there are three build configurations:
- format;
- delivery;
- merge.

The problem is that when pushing into the first project, the tests are carried out in the second, although they should not.

0
2 comments

That doesn't make much sense, could you share screenshots of the VCS Roots, triggers and the dependencies of each configuration?

0
Avatar
Permanently deleted user

Thanks for the answer.
This question is irrelevant.

0

Please sign in to leave a comment.