Should Visual Studio Remote Run include archived projects?

TeamCity 8.0.4 (27616)

When I configure a remote personal build from Visual Studio, the "Suitable Configurations" list includes archived projects and build configs.

I don't remember this being the case in version 7.

Is this by design?

Is there a way to hide archived projects and build configs from remote run?

Thanks,

-Shawn

1 comment
Comment actions Permalink

Hello, Shawn
It is a bug, introduced in 8.0 version Please feel free to watch/vote/comment this issue in tracker.
Sorry for the inconvenience!

0

Please sign in to leave a comment.