Should Visual Studio Remote Run include archived projects?
TeamCity 8.0.4 (27616)
When I configure a remote personal build from Visual Studio, the "Suitable Configurations" list includes archived projects and build configs.
I don't remember this being the case in version 7.
Is this by design?
Is there a way to hide archived projects and build configs from remote run?
Thanks,
-Shawn
Please sign in to leave a comment.
Hello, Shawn
It is a bug, introduced in 8.0 version Please feel free to watch/vote/comment this issue in tracker.
Sorry for the inconvenience!