Triggering build of project through dependancies

We have a project B that has a dependancy of A, so everytime A builds it triggers a build on B.  However we want to change this so that we only build B once a day (at midnight) if there have been changes on A i.e. not everytime A is built throughout day.  Is is possible to configure the triggers to do this?

1 comment

Unforchanatly, this is currently not possible. Here is an issue to address this: http://youtrack.jetbrains.net/issue/TW-6473
You can vote/watch/comment for it.

0

Please sign in to leave a comment.