VCS Trigger - Cancelling the current build

Is there a way, using a check-in comment, to cancel any current builds so that the new check-in can be included?

1 comment
Comment actions Permalink

There's no way to do this from interface. If you'd like to cancel a build when new checkin arrives (which is a bad idea, I think), you can create a post-commit hook in VCS or a new build configuration in TC that will do nothing, but send a REST API command to cancel builds you need. Details here: http://confluence.jetbrains.com/display/TCD8/REST+API

0

Please sign in to leave a comment.